TestDirector in the real time projects
Describe how to use the TestDirector in the real time projects?
Expert
Once completed the preparing of the test cases.
a) Export the test cases into Test Director. (It will comprise total 8 steps).
b) Test cases will be loaded in the Test Plan module.
c) Once the execution is begun, we move to the test cases from Test Plan tab to the Test Lab module.
d) In Test Lab, we execute the test cases and put as fail or pass or incomplete. We make the graphs in the test lab for daily report and sent to the onsite (wherever you want to deliver).
e) If you get any defects and increase the defect in the defect module. Whenever raising the defect, join the defect with screen shot.
Hi Assignment Team, Please find attachnment of my assignment. Please advise if there is anything unclear in the assignment. Regards, King
What are the various kinds of Cohesion? Describe briefly?
Is new web technologies such as XHTML, Flash, CSS and XML modified the SEO game or the manners search engines function?
How can I solve my above Software Engineering problem? Please suggest me the accurate answer. The main aim of integration testing is to determine: (i) Design errors (ii) Interface errors (iii) Procedure errors (iv) Analysis errors.
I have a problem in Software Engineering on Evolutionary Development Model. Please help me in the following question. The model in which the needs are implemented by the classification is: (1) Evolutionary Development Model (2) Iterative Enhancement M
What do you mean by the term Software Quality Assurance? Briefly illustrate it.
What is the process to calculate the ‘Expected Value’ for the Software size?
What do you mean by the term System Modeling? Briefly explain it.
Write down a short note on the steps followed in the testing?
What are the different kinds of coupling? Explain it briefly?