Load test on piles
What are the main reasons to carry out the pile load test?
Expert
Load test on piles:
The main reasons to carry out the pile load test consists of:
a. In order to design other piles obtaining of back- figured data becomes easy.b. Calculation of overall cost involved in the work becomes easy due to knowledge of pile length.c. By using the pile driving and geotechnical formula the results can be counter checked.d. Structural soundness of the pile can also be checked.
Test loading:The four types of tests which are usually carried out on the piles are-
Write about the steel sections which are used in the construction.
Assignment 2 – Problem Solving Task – Contractual Duties and Responsibilities for Construction Failure and Dispute Resolution Type: Individual assignment Due: Week 11 Wednesday 11th October 2012 6pm Weight: 30% overall of the unit Penalty for Late Submission: 3% per each day You are required
Write about “Timber – in construction”.
Explain the effect of clearance on work done in a Reciprocating Compressor.
Explain the effects of friction on the flow through a steam nozzle?
Explain EC engines with an example.
List the merits and demerits of Gas Turbines.
What are the properties of good Lubricating Oil?
Write down any three major testing on stones?
State the disadvantages of Hydroelectric Power Plant.
18,76,764
1922571 Asked
3,689
Active Tutors
1450374
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!